Legislation Details

File #: MC 2026-196    Version: 1 Name:
Type: motion Status: Agenda Ready
File created: 9/29/2026 In control: City Council Meeting
On agenda: 10/21/2026 Final action:
Title: Sole Source: Pureflow Model C-3000H Iron & Manganese Removal System
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

                                                   

 

STRATEGIC OUTCOMES

 

ACTION

Department:

x

Safe & Prosperous

x

Motion

Finance

 

Active & Appealing

 

Resolution

 

 

Respected & Responsible

 

Ordinance - Introduction

Division:

 

Connected & Engaged

 

Ordinance - Adoption

Procurement

 

Unique & Creative

 

Public Hearing

 

TITLE:

title

Sole Source: Pureflow Model C-3000H Iron & Manganese Removal System

 

end

 

SUMMARY RECOMMENDATION:

Summary Recommendation

Authorize the sole source purchase of Pureflow Model C-3000H Iron & Manganese Removal System at the expenditure of $906,810.16 to Pureflow Filtration Division, Whittier, California. (Utilities SS-27-149) (Jeremy McCall/Robin Wilson)

end

 

STRATEGIC OUTCOME:

This item supports the City Council’s strategic outcome of Safe and Prosperous by improving the capacity of the groundwater treatment system at the Agua Viva Water Treatment Facility.

 

REPORT:

Expansion of groundwater treatment capacity is needed at the Agua Viva Water Treatment Plant so the City can use all three on-site wells and strengthen supply reliability. The plant treats water by two principal methods: surface water from the adjacent canal and groundwater from on-site wells. The surface water plant is rated at 20 million gallons per day (MGD) using a membrane system. The groundwater treatment system (GWTS), installed in 2005 and now in operation for over 20 years, is currently sized at 6 MGD and consists of three multi-media horizontal pressure filters with associated backwash pumps and tank and chemical feed systems. Three wells, each rated at 3 MGD, can produce a combined 9 MGD, but only two wells are operable because the existing filters are near full treatment capacity.

 

Multi-year drought conditions across the Southwest and potential reductions in Colorado River surface water allocations have led cities throughout the state to diversify sources and optimize existing supplies. Because a third well is already available, staff recommends increasing filtration capacity so all three wells can be treated. Adding a fourth filter vessel of the same style as the three existing units will raise GWTS capacity from 6 MGD to 9 MGD and allow the plant to use the full well field without changing the established treatment process.

 

Using the original equipment manufacturer, Pureflow Filtration for the equipment, PM200 media, engineering support, and technical services is needed for the expansion. This procurement method is warranted to match the existing vessels, expand the current control scheme, and avoid compatibility risk with a 20-year-old system that continues to perform well. Using the OEM will ensure integration with current facilities, preserve established treatment performance standards, and provide the background and control architecture needed for a successful installation.

 

The Project is estimated to begin early January of 2027 and be completed by June 30, 2027.

 

FISCAL REQUIREMENTS:

CITY FUNDS:

$ 906,810.16

BUDGETED:

$ 3,200,000.00

STATE FUNDS:

$ 0.00

AVAILABLE TO TRANSFER:

$ 0.00

FEDERAL FUNDS:

$ 0.00

IN CONTINGENCY:

$ 0.00

OTHER SOURCES:

$ 0.00

FUNDING ACCOUNT/FUND #/CIP:

TOTAL

$ 0.00

Wastewater Operating Fund

 

FISCAL IMPACT STATEMENT:

Sufficient budget capacity is provided in the FY 2027 City Council approved budget to authorize this purchase.

 

ADDITIONAL INFORMATION:

SUPPORTING DOCUMENTS NOT ATTACHED TO THE CITY COUNCIL ACTION FORM THAT ARE ON FILE IN THE OFFICE OF THE CITY CLERK:

 

None

 

IF CITY COUNCIL ACTION INCLUDES A CONTRACT, LEASE OR AGREEMENT, WHO WILL BE RESPONSIBLE FOR ROUTING THE DOCUMENT FOR SIGNATURE AFTER CITY COUNCIL APPROVAL?

 

 

Department

 

City Clerk’s Office

 

Document to be recorded

 

Document to be codified

 

Acting City Administrator:

Date:

John D. Simonton

10/12/2026

Reviewed by City Attorney:

Date:

Richard W. Files

10/08/2026